Cases

Cases

解决方案

Surface power station


Release Date: 2022-11-11 11:54:35.362

For the centralized ground power station, a customized comprehensive automatic cleaning scheme is provided. The overall scheme includes the following equipment supply and services:

1. Overall layout optimization

2. Engineering design and accounting

3. Selection, design and production of automatic cleaning robot equipment

4. Cross row machine equipment selection (if any) and production

5. Structural member selection, design and production

6. Communication management equipment selection

7. Control system and software

8. On site service

9. Warranty service